Transport for London Pilots the RE:FIT Programme in 22 Head Office Buildings
01 January 2013
TfL played a key role in the Greater London Authority’s successful pilot of the RE:FIT programme, implementing a range of energy saving measures across 22 of its Head Office buildings. These improvements will yield annual energy savings worth £500,000 and cut 2,400 tonnes of CO2 emissions.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: Transport for London
-
Low Carbon Workplace’s Refurbishment of Premier House
07 April 2016
The Low Carbon Workplace explains how they achieved a 64% energy reduction following the refurbishment and increased occupier awareness in Premier House in Twickenham.
Topic: Retrofit & Refurbishment
Type: Case Studies
-
LaSalle Launches their First Sustainable Development and Refurbishment Standard
17 March 2016
This easy to use guide provides useful information about different sustainability areas that can be addressed through LaSalle's refurbishment or development projects such as energy, water and waste but also transport, materials and health & wellbeing, among others. It includes a useful checklist for use by LaSalle’s project teams as well as case studies of recent LaSalle projects.
Topic: Retrofit & Refurbishment
Type: News
Member: LaSalle Investment Management
-
SEGRO – Retrofitting PV Roof Panels
16 December 2015
SEGRO has taken on a PV retrofit project that has helped bring them 30% lower electricity rates for its occupiers as well as £600.000 of extra income in 2014.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: SEGRO
-
M&G Real Estate’s LED Lighting Refurbishment at Minster Court
27 November 2015
M&G have carried out a major lighting refurbishment in the common parts of 1 and 2 Minster Court helping reduce the lighting energy use by 62% saving the occupiers £53,485 per year.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: M&G Real Estate
-
Shaftesbury’s Sustainable Retrofit at 22 Ganton Street
11 November 2015
The project exemplifies the company’s proactive approach to asset management and commitment to the long-term sustainability of its buildings. By retaining 99% of the building’s structure and 80% of its façade, Shaftesbury significantly reduced the amount of new materials required and cut construction waste, minimising environmental impacts and generating cost savings.
Topic: Retrofit & Refurbishment
Type: Case Studies
Member: Shaftesbury Capital
-
Canary Wharf Group Announces Major Lighting Upgrade to Retail Areas
08 September 2015
Canary Wharf Group has carried out a major lighting upgrade across a number of its malls saving more than £400,000 and over 1,951 tons of carbon annually.
Topic: Retrofit & Refurbishment
Type: News
Member: Canary Wharf Group
-
Fit-Out For The Future
06 August 2015
Jenny Pidgeon, Head of Sustainability at TH Real Estate, talks about the launch of the BBP's latest project, a Sustainable Fit-Out Guide that is designed to equip all the various parties involved in fit-out with the knowledge to ask those right questions and when is the best time to do it.
Topic: Retrofit & Refurbishment
Type: Blogs
Member: Nuveen Real Estate