The Requirements Brief
A Requirements Brief is key occupier document that captures all desired sustainability principles and design requirements of a fit-out. It should seek to cover the whole project life-cycle and be developed as early as possible. It serves as reference document at key project stages and will evolve to become more refined and detailed through the course of the fit-out project.
A clear, concise requirements brief, that develops over time can:
- Provide a simple set of requirements to inform an occupier’s Search for Space and Engagement & Agreement with owners and letting agents.
- Be used as a primer to support Project Team Procurement & Set-up, before being used as a core document in the briefing of the selected team.
- Help build a foundation for design and specification documents.
- Ensure that Design Review and Construction delivery meet the occupier’s and owner’s requirements.
- Support a smooth Commissioning and Handover by allocating appropriate resource to those phases.
To support the development of a Requirements Brief, a Requirements Brief Framework is included to guide occupiers through this process of identifying and recording sustainability design principles.
The table below is a summary of the Requirements Brief Framework providing principles for considerations structured around a set of sustainability related aspects.
Requirements Brief Framework Summary
1. Fit-out Rating Tools
Toggle
2. Layout & Space Planning
Toggle
- Create Spaces that Support Different Working Needs
- Design for a Healthy & Active Workforce
- Co-ordinate Layout, Fenestration & HVAC Design
- Build in Adaptability
3. Lighting
Toggle
- Design for Different Functional Spaces
- Design for Productivity
- Design to Maximise Daylight
- Design to Reduce Glare
- Design for Energy Efficiency
- Design Appropriate Lighting Zones & Controls
See Lighting.
4. Heating, Ventilation & Air Conditioning
Toggle
- Assess the Base-Build Specification.
- Undertake a Thermal Comfort Assessment.
- Consider Natural Ventilation & Mix-Mode Strategies.
- Choose Efficient Equipment.
- Select Appropriate Controls.
- Ensure HVAC Design Meets Indoor Environmental Quality Requirements.
See HVAC.
5. Green Infrastructure
Toggle
- Select Space with Green Infrastructure.
- Review Opportunities to Improve Site Ecology.
- Enhance Internal Green Infrastructure & Biodiversity.
See Green Infrastructure.
6. Materials
Toggle
- Review Opportunities to Reuse Materials.
- Base Procurement Decisions on Lifecycle Costs & Impacts.
- Prioritise Materials with Low Environmental Impacts.
- Specify Materials with Low/No Pollutant Levels.
- Review Suppliers Responsible Sourcing Policies.
- Prefer Locally Sourced Material & Services.
- Embed Principles in a Procurement Plan.
See Materials.
7. Furniture
Toggle
- Undertake a Utilisation Assessment.
- Select Furniture to Complement Layout & Agile Working.
- Review Opportunities to Reuse Furniture.
- Base Procurement Decisions on Lifecycle Costs & Impacts.
- Prioritise Furniture with Low Environmental Impacts.
- Select Furniture that Supports Employee Wellbeing.
- Review Suppliers Responsible Sourcing Policies.
- Prefer Locally Sourced Product & Suppliers.
- Develop an Operational Strategy.
See Furniture.
8. Metering & Monitoring
Toggle
- Develop a Metering & Monitoring Strategy.
- Assess Base-Build Metering & Monitoring.
- Select ECA Eligible Equipment.
- Design for Commissioning & On-going Maintenance.
9. Small Power Electrical Equipment
Toggle
- Assess Potential Power Use to Help Inform Design.
- Base Procurement Decisions on Lifecycle Costs & Impacts.
- Choose Energy Efficient Equipment.
10. Water
Toggle
- Determine Water Metering Requirements.
- Develop a Water Quality Strategy.
- Reduce Water Leakage Risks.
- Specify Water Efficient Sanitary Fittings.
- Explore Rainwater Harvesting & Greywater Recycling.
See Water.
11. Waste - Construction
Toggle
- Design for Re-use & Recovery.
- Design for Off-site Construction.
- Design for Materials Optimisation.
- Design for Deconstruction & Flexibility.
- Set Waste Management Targets.
- Use a Site Waste Management Plan.
- Embed Requirements in Contractor Scope of Works.
12. Waste - Operations
Toggle
- Review Existing Waste Management Regimes.
- Set an Operational Waste Management Strategy.
- Define Appropriate ‘Back-of-House’ Requirements.
- Define Appropriate ‘Front-of-House’ Requirements.
- Embed Responsible Waste Management in Service Contracts.
See Waste - Operations.
13. Transport
Toggle
- Undertake a Travel Survey.
- Choose a Building with Good Transport & Cycling Links.
- Build Facilities for Active Commuters.
- Continue Employee Engagement During Operation.
See Transport.