Aberdeen Asset Management Engages with Biffa on PV

24 May 2016
Topic: Energy/Carbon
Type: Case Studies
Member: abrdn
Aberdeen Asset Management Engages with Biffa on PV

Aberdeen Asset Management Engages with Biffa on PV

24 May 2016
Topic: Energy/Carbon
Type: Case Studies
Member: abrdn

Aberdeen Asset Management has completed the installation of a 250 kWp solar PV (photovoltaic) array on an investment property within its UK portfolio. The industrial installation, comprising 1,000 solar panels, will provide renewable energy to occupier Biffa Waste Services, at a discount versus National Grid rates.

Key Facts

  • Up to 30% of Biffa’s energy use on site from PV
  • £575,000 net income for Aberdeen over 20 years
  • £280,000 savings for Biffa over 20 years
  • 225,000 kWh of renewable electricity each year
  • 120 tonnes less CO2 per year

Situation

Aberdeen Asset Management is a global investment management group. Through its energy management strategy, Aberdeen works closely with occupiers to help them reduce their CO2 emissions, improving energy efficiency and using low-carbon energy sources. Aberdeen funds the installation of PV on suitable assets, where it generates a reasonable risk-adjusted return on investment.

Actions

Aberdeen commissioned Syzygy Renewables to assess PV applicability across its UK property portfolio of around 800 properties. Syzygy identified a shortlist of properties where there were good opportunities for PV. These included a 16,720m² industrial property in Edmonton. This site is home to Biffa’s key waste recycling plant in London and has 20 years left to run on the lease.

Aberdeen appointed Syzygy to manage the Edmonton project, which included carrying out a detailed feasibility study, producing the technical specification and tendering the project. Syzygy continues to monitor and operate the facility on Aberdeen’s behalf.

Benefits and financials

Forecast financial and environmental returns on Aberdeen’s £295,000 investment:

  • Income for Aberdeen over 20-year lease term: £870,000 (net £575,000), with payback within 8.1 years.
  • Savings for Biffa over 20-year lease term: £280,000, with a 25% discount versus grid rates.
  • 225,000 kWh of renewable electricity each year, up to 30% of Biffa’s consumption on site.
  • 120 tonnes less CO2 per year.

Performance October 2015 to March 2016, when PV produces less power than in the summer:

  • 99% of output target achieved.
  • 80% of energy generated consumed on site, with the remainder exported to the National Grid.
  • 21% of Biffa’s energy consumption on site provided from the PV array.

Additional benefits include:

  • Providing medium- to long-term mitigation against future legislation, such as the Minimum Energy Efficiency Standards, which will prohibit owners from letting out most properties that have EPC ratings of F and G from April 2018, until they have improved the ratings to E or better.
  • Improving returns for clients both by generating income from renewable electricity and by enhancing the future marketability of the site, which can enhance rental income and asset value.

Challenges and Achievements

 

OCCUPIER

 

How to get occupier agreement?

 

At Edmonton, Biffa had control of the roof space through an FRI (full repairing and insuring) lease. Aberdeen approached Biffa as part of its energy management strategy. Biffa responded positively to the PV project, as it supports the waste management firm’s commitment to high environmental standards, at the same time as delivering operational cost savings. There were no major barriers to the project for Biffa, as Aberdeen funded the capital costs and Syzygy provided a skeleton structure for lease amends, used on a number of similar projects, to minimise disruption to the lease. In addition, the installation was implemented without affecting site operations. Members of the Biffa team involved included Head of Property, Nick Barsby, who led the project for Biffa, and General Manager for Edmonton, David Heaton.

 

COMMISSIONING

 

How to ensure PV installations run smoothly?

 

Every project is different and it is advisable for the team to include someone with experience of PV installations. At Edmonton, Aberdeen partnered with Syzygy, which has experience across around 200 projects, most of which were undertaken at live sites. Syzygy, Biffa and the contractor Solar Advanced Systems met regularly throughout the commissioning process. In addition to complying with Construction (Design and Management) Regulations, the team worked within Biffa’s health and safety requirements and Aberdeen’s insurance obligations, including using the SolarEdge DC-AC PV inverter, which offers best-in-class fire safety features. Commissioning and snagging took around a month, from starting on site to project completion.

 

MONITORING

 

How to ensure the occupier is accurately billed?

 

Where occupiers will be recharged for electricity, it is important to have a good monitoring platform to accurately identify what has been consumed. At Edmonton, in addition to a meter measuring what the PV panels are generating, a private export meter was installed alongside the occupier’s mains meter to allow live, and accurate measurement of what is being consumed.

Find out more

Dan Grandage

Head of Responsible Property Investment

Aberdeen Asset Management

 

www.aberdeen-asset.com

*Please note that the information on this page was supplied by the BBP Member and the BBP assumes no responsibility or liability for any errors or omissions in the content